Appendix 1 – TfSE SIP Investment Packages
Global Policy Interventions
The following global policy interventions are designed to address the challenges and opportunities that affect the whole of the south east and the wider UK. These include existential challenges such as global warming and opportunities such as new mobility technologies.
The key global policy interventions that would help deliver the investment priorities in the south east are:
Intervention |
Measures |
Decarbonisation |
Involving rapid adoption of zero emission technologies to decarbonise transport |
Public Transport Fares |
Making the cost of public transport attractive compared to motoring |
New Mobility |
The use and promotion of technologies such as electric bikes and scooters to boost active travel |
Road User Charging |
Encourage the UK government to develop a national road user charging system. To provide an alternative source of funding to fuel duty. |
Virtual Access |
Provision for virtual working to reduce travel demand |
Integration |
Across and between all modes of transport - infrastructure, services, ticketing and accessibility. |
Area based SIP Investment packages
Solent and Sussex Coast
The geographic extent of this package is from the New Forest in the west to Hastings in the east. For East Sussex it will strengthen east-west connectivity and resilience of the strategic and local highway network with the inclusion of the A27 Lewes – Polegate, improvements to the A259 South Coast Road Corridor – Eastbourne – Brighton. It will extend Mass Transit along the Sussex Coast alongside local cycling and walking infrastructure to support strategic active travel.
Solent and Sussex Coast |
|
Type of measure |
Scheme & Location |
Mass Transit |
Falmer Strategic Mobility Hub |
Eastbourne/Polegate Strategic Mobility Hub |
|
Sussex Coast Mass Rapid Transit |
|
Eastbourne/ South Wealden Mass Rapid Transit |
|
Hastings/Bexhill Mass Rapid Transit |
|
A27 Falmer – Polegate Lay Bus Stop & Layby improvements |
|
Active Travel |
Sussex Coast Active Travel Enhancements – including Local Cycling Walking Infrastructure Plans) |
Highways |
A27 East of Lewes – smaller interventions package (Roads Investment Strategy 1/2 scheme) |
A27 Lewes – Polegate (Roads Investment Strategy 3 pipeline scheme) |
|
A259 South Coast Road Corridor – Eastbourne to Brighton (existing Major Road Network scheme) |
|
A27 Falmer Junction Enhancements |
London - Sussex Coast
This package covers the key corridors between London and the Sussex Coast (from Chichester to Eastbourne) and includes five packages of interventions for this area. In East Sussex it will provide multi modal improvements across the network, supporting both greater connectivity, particularly inter urban, and crucially resilience.
Key schemes included for rail include Lewes – Uckfield reinstatement, the electrification (or other alternatives) of the Uckfield line between Uckfield and Hurst Green, and a potential strategic transport hub intercepting and linking road with rail, bus and active travel movements near Eastbourne. Highway improvements include the A22 corridor improvements in South Wealden and from Hailsham to Uckfield, and mass transit schemes on key corridors of movement. This is alongside improvements to strategic cycleways.
London – Sussex Coast |
|
Type of measure |
Scheme & Location |
Rail Package |
Brighton Mainline Improvements |
East Sussex Coastway Line – faster services |
|
Newhaven Port – Rail freight access |
|
Newhaven Port Capacity and Rail Freight Interchange |
|
Uckfield – Hurst Green Electrification |
|
Uckfield – Lewes Line Re-opening – Traction and Capacity Enhancements |
|
Uckfield – Lewes Line Re-opening – Reconfiguration at Lewes |
|
Eridge – Tunbridge Wells – re-opening of railway line – commercial service |
|
Active Travel |
Eastbourne/Hailsham Local cycleways |
Lewes/Newhaven Local cycleways |
|
East Sussex Inter urban cycleways |
|
Mass Transit
|
A26 Corridor Lewes – Tunbridge Wells (Rural bus service enhancements) |
A26 Corridor – Newhaven area rural bus service enhancements |
|
Highways |
A22 Corridor package (existing Major Road Network scheme – Hailsham & Stone Cross) |
A22 Corridor Hailsham – Uckfield |
|
A22 Uckfield Bypass dualling |
|
A2270 – A2101 Corridor Movement and Access package |
|
A26 Lewes – Newhaven re-alignment and junction improvements |
|
A26 Lewes -Uckfield enhancements |
Kent, Medway and East Sussex
This area covers Kent and Medway and the Hastings and Rother areas of East Sussex. For East Sussex it sets out a multi modal approach which supports regeneration and growth and levelling up, with the inclusion of the High Speed 1 ‘Marshlink’ Hastings, mass transit options for Bexhill and Hastings to encourage greater public transport usage. The package includes safety improvements on the A21 corridor as well as the dualling of the road between Kippings Cross and Lamberhurst and the Flimwell and Hurst Green bypasses.
Kent, Medway and East Sussex |
|
Type of measure |
Scheme & Location |
High Speed Rail |
High Speed 1/Marshlink’ Hastings, Bexhill & Eastbourne upgrade |
Active Travel |
Faversham – Canterbury – Ashford – Hastings – NCN enhancement |
East Sussex Local Cycleways |
|
East Sussex Inter urban cycle ways |
|
Tunbridge Wells - Hastings NCN enhancement |
|
Highways |
A21 Pembury – Hastings Safety enhancements (RIS2 scheme) |
A259 level crossing removal – east of Rye (Star and Guldeford level crossings) |
|
A21 Kippings Cross – Lamberhurst – dualling and Flimwell and Hurst Green Bypasses |
|
Hastings and Bexhill distributor roads |